Training Room Conversion Work Required

Item Estimated Cost (materials and labour) €
First Floor installation – steel joists /timber floors for storage 1150
Stairs to first floor 1500
Partition and door at North end 2200
Kitchen and Equipment 1500
Additional power connections 550
   
Totals 6900